On site

Watch a live job run without chasing us for updates.

Posted while the jobs run, because finished photos are easy and live sites are proof.

16 October 2026 · 65 Kim Yam Road

Roof tiles lifted and numbered before removal, so each one goes back where it came from.

65 Kim Yam Road on 16 October 2026

9 October 2026 · Church rebuild

Timber ceiling panels fixed to the vault framing. Lighting runs set out before the boarding closed up.

Church rebuild on 9 October 2026

2 October 2026 · Tuas dormitory

Escape route signage installed and the corridor cleared end to end ahead of inspection.

Tuas dormitory on 2 October 2026

25 September 2026 · 13 Boscombe Road

Wet area waterproofing laid and flood tested. Held water overnight before tiling started.

13 Boscombe Road on 25 September 2026

18 September 2026 · 65 Kim Yam Road

Staircase stringers surveyed and photographed. Two treads beyond repair, matched and replaced like for like.

65 Kim Yam Road on 18 September 2026

11 September 2026 · Tuas dormitory

Laundry drainage and power points set out. Machines positioned so water stays in one room.

Tuas dormitory on 11 September 2026

In their words

Real Stories, Real Impact.

Chairman Goh, Tai Seng Christian ChurchOn the rebuild, and what the committee needed to hear.
Arno, Global BarrelsOn the dormitory built above a factory that never stopped running.
Derek and Esther, Landed Home RebuildEsther works in fintech and Derek works for an airline. On rebuilding their family home with Tan Poh Eng.

Some of the clients we have served since 1981.

Get us to walk your building, free, with no obligation.

Send the address and your drawings, plus a few photos. The walk is free.