For pastors, elders and building committees
Every cost in writing. Early warning the moment anything shifts.
Built by believers who know you answer to your members for every decision.
The problem
Variations nobody approved. Exclusions nobody read.
A timeline nobody updated until the committee found out last.
Timelines
Approvals, weather and what's found on site can move any timeline.
Case study
Full every service, and nearly a century of memories nobody wanted to lose.
We rebuilt it for the next generation. The cross is cut into the wall, never stuck on. Hear the building committee chairman tell it.
Chairman Goh, Tai Seng Christian Church. On the rebuild.
Drag to compare
A walk through the finished church
The street still recognises its church
The original shophouse style frontage was retained and restored rather than demolished. Timber shutters were rebuilt in the same proportions and repainted in the blue the congregation remembers, so the building reads as the same church from the road.
A cross cut into the wall, so it outlasts every fitting in the room
The feature wall is clad in timber with the cross recessed into it rather than hung on it. The pitched acoustic ceiling features linear luminaires integrated between the ceiling strips, ensuring the main sanctuary is well-lit while maintaining an unobtrusive design that does not detract from the cross.
Every seat sees the stage, and every seat stays cool
Fixed teak pews run on a stepped floor so sightlines hold from the back row. Air conditioning, sound and lighting were routed through the ceiling at build stage, which is why nothing hangs on the walls. The sanctuary is also equipped with state-of-the-art Bluetooth hearing assistance technology to provide individuals with a direct audio link to our Sunday worship services and sermons.
Capacity above, control above, nothing on the floor
An iconic tiered seating area was installed above the mezzanine level to provide additional space and house the projector, monitor screen, and stage lighting. Cabling was concealed within the structure during construction to ensure the sanctuary floor remains clear for the congregation.
The whole room, in one view
From the gallery the plan reads clearly: a raised stage, the timber feature wall, high windows on both sides for daylight, and a roof line that lifts the eye to the cross. The concealed baptismal pool integrated into the centre of the stage floor serves as a profound moment for those who choose to make a public declaration of their faith.
Space for everything that happens between services
Glass block walls bring daylight into the side rooms without losing privacy. Folding partitions let the church open two rooms into one for classes, meetings and meals.
Visible from the junction, as the old one was
A visible testimony of my Lord Jesus Christ. It represents the death and resurrection of Jesus Christ and His victory over sin and death.
"For the message of the cross is foolishness to those who are perishing, but to us who are being saved it is the power of God." 1 Corinthians 1:18 (NKJV)
Built to stay where the congregation is
The church stayed on its own land at 140 Yio Chu Kang Road rather than moving out. Rebuilding on a tight urban plot, with neighbours on three sides, is the kind of job the committee hired us for.
The parts nobody photographs, done properly
Drainage, external washing points, services access and fire doors all sit at the rear. Stone cladding and a flush drainage channel mean the back of the building is finished to the same standard as the front.
The Salvation Army. A TPE church project still serving decades on.
In their words
The plan
Free for committees
How to compare quotations, and the seven questions to ask every contractor.
Lunch & Learn
A free session at your church with Zelia and a practising architect. Private invite available upon request.
Rebuild, extend or reconfigure. A free session at your church with Zelia and a practising architect. Private invite available upon request.
The lessons from 45 years of church and heritage builds, then your questions.
Other buildings
URA letters, party walls and rot don't wait. 50+ conservation projects since 1981.
ConservationStop renting beds for your workers. You own the floor.
DormitoriesStraight, dry and quiet in twenty years.
HomesAdditions, alterations and full rebuilds, submitted and built by one company.
The workFree, and your committee keeps everything we tell you.
Get the seven questions to ask any contractor before you sign. Free, and they work on us too.